EKO Industrials · PRD-IND-001

Risk Register Template

A ready-to-use Excel risk register that scores each risk automatically and shows at a glance which ones are critical.

Description

Most organisations keep a risk register in a spreadsheet somebody built once. Scores are calculated differently by different people, the risk levels mean nothing consistent, and the rows below the first few quietly stop working.

This template supplies the structure and does the scoring. You enter a probability and an impact from one to five; the workbook calculates the score and assigns the risk level itself. The four levels are coloured, so a Critical row is visible without reading the sheet.

It comes with its own instructions sheet and a reference sheet stating exactly how the scoring works — the score is probability multiplied by impact, and the four bands are a stated design choice, labelled inside the workbook as not a regulatory requirement.

One clearly marked example row shows the intended use, and five further rows are pre-formatted with live formulas so the register works from the first entry.

Who it is for

The person responsible for keeping a risk register and without a method for it — an operations or quality manager, a project lead, a small-organisation risk owner.

No risk-management qualification is assumed.

The problem addressed

Risks are recorded inconsistently or not at all. Scoring differs between people and between periods, so registers cannot be compared, and a register that under-reports its own risk profile is worse than none because it looks authoritative.

The outcome

A register in which every risk is scored the same way, the levels mean the same thing, and the critical rows are visible immediately.

What is included

One XLSX workbookThree sheets
Risk Register16 columns: Risk ID · Category · Description · Cause · Consequence · Probability · Impact · Score · Risk Level · Owner · Response Strategy · Actions · Due Date · Status · Residual Risk · Notes
Risk Level ReferenceThe scoring method and the four bands, stated
InstructionsHow to use the workbook
Working formulas to row 200Score and Risk Level, guarded
Conditional formattingFour coloured risk bands
AutofilterAcross the working range
One example rowClearly marked, shaded, and never presented as real data

What is not included

Not included
A risk management methodologyThe template records; it does not prescribe a method
A regulatory or standard-compliant column setNo column list is presented as a universal obligation. A different engagement may need a different set
Certification of any kindEKO certifies nothing
Any service, support or adviceNone accompanies the file
Population of the registerThe client's own risks are the client's own
SoftwareRequires the client's own spreadsheet application

Format

One .xlsx file. Three sheets, 16 columns, formulas active to row 200.

Closed decisions

Delivery mode

Digital download of the XLSX file after purchase.

Licence

Single-organisation internal-use licence.

The buyer mayThe buyer may not
Use the workbook inside their own organisationResell it
Adapt it internally for their own useRedistribute it, in any form
Sublicence it
Use it as a commercial deliverable to their own clients

This is option A of the three the decision pack set out. The consultant-use licence was not chosen, which keeps this a single-organisation product.

Decided sales channel

www.ekoonlinebusiness.com.